Process
From first chat to moving in
A clear, five-stage process with sign-off at every step. A 3 BHK usually takes ten weeks from design approval.
- 01
Meet and measure
A free consultation at the studio, then a site measure of every wall, window and switch.
- 02
Concept and budget
Mood boards, a layout and a line-by-line budget. You pay the design fee once you're happy.
- 03
3D and materials
3D views of every room and a material board you can touch at the studio.
- 04
Factory and site
Units are made in our Hosur factory while civil and electrical work happens on site.
- 05
Install and style
Fitting, deep cleaning, styling and a 146-point check before you get the keys.
Payment schedule
You pay as work is completed on site. Each stage is checked with you before the next invoice.
| Stage | Share |
|---|---|
| Design sign-up | 10% |
| Design approval and order to factory | 40% |
| Material delivered to site | 35% |
| Installation complete | 10% |
| Handover and snag list closed | 5% |