Warehouses and PEB
Grade-A logistics warehouse
Pre-engineered building with a 36 m clear span, 12 m eaves and dock levellers.
Steel 420 tCompleted 2026
Fabrication · Detailing · Erection
Warehouses, pre-engineered buildings, pipe racks, space frames and bridges from a 6,000-tonne-a-year yard in Taloja. Tekla detailing, shop-primed or galvanised, erected by our own crews.
Recent work
Warehouses and PEB
Pre-engineered building with a 36 m clear span, 12 m eaves and dock levellers.
Steel 420 tCompleted 2026
Roofs and space frames
Double-layer space frame with skylight glazing over a 1,900 sq m atrium.
Steel 95 tCompleted 2025
Bridges and solar
Galvanised mounting structures, supplied and erected across 60 acres.
Steel 650 tCompleted 2026
Capabilities
We take your consultant's GFC drawings, or design to your brief, and hand over a structure that's measured, tested and documented.
Start an enquiryTekla models, connection design, shop and erection drawings.
CNC beam line, plate cutting, SAW and MIG welding, shot blasting.
Primer and paint systems, epoxy, or hot-dip galvanising through partners.
Own crews, cranes up to 50 t and a full-time safety officer on every site.
420 tonnes fabricated and erected in 14 weeks, a fortnight early. The bolt-up was clean enough to show investors.
Project director, logistics park developer (sample)
They detailed our consultant's drawings in Tekla, flagged two clashes before fabrication and saved us a site rework.
Construction manager, chemical company, Taloja (sample)
The FOB went up in one night block. Railway inspectors signed off the welds without a single remark.
Executive engineer, rail infrastructure contractor (sample)
Send your structure details in two minutes. Our estimators reply within two working days.