About us
Steel people since 2001.
Rajesh Iyer set up Steelcraft in 2001 with six welders and a rented gantry (sample story). Twenty-five years later, we fabricate and erect up to 6,000 tonnes of steel a year.
We work for developers, EPC contractors and manufacturers who want a single team answerable from drawing to the last bolt.
- 2001founded (sample)
- 310structures erected
- 180people on our rolls
- 0lost-time incidents in 2025
Milestones
- 2001
Six welders and a rented gantry (sample).
- 2008
Own yard in Taloja MIDC.
- 2014
CNC beam line and Tekla detailing.
- 2019
ISO 45001 safety system (sample).
- 2026
Third covered bay; 6,000 t a year.
How we work with buyers
Safety first, always
Harness, helmet and permit to work on every lift.
Drawings checked twice
Clashes caught in the model, not on site.
Tonnes you can trace
Every member traced to its mill certificate.
Dates we keep
An erection plan agreed with you and updated weekly.
The people you'll deal with
Rajesh Iyer
Managing director
Structural engineer, 26 years in steel. Reviews every job before quotation (sample).
Snehal Gaikwad
Head of design and detailing
Tekla models, shop drawings and connection design.
Baljeet Singh
Erection manager
Runs site teams, cranes and safety. Over 2 million safe man-hours.
Mariam Khan
Planning and commercial
Tonnage take-offs, schedules and billing against progress.
What buyers say
420 tonnes fabricated and erected in 14 weeks, a fortnight early. The bolt-up was clean enough to show investors.
Project director, logistics park developer (sample)
They detailed our consultant's drawings in Tekla, flagged two clashes before fabrication and saved us a site rework.
Construction manager, chemical company, Taloja (sample)
The FOB went up in one night block. Railway inspectors signed off the welds without a single remark.
Executive engineer, rail infrastructure contractor (sample)
Drawings ready? Get a tonnage and a price.
Send your structure details in two minutes. Our estimators reply within two working days.