// custom injection moulding · 30 to 650 t · since 2006 (sample)

Precision plastic parts, from first drawing to millionth piece.

We design moulds, cut them in our own tool room and mould parts in 14 engineering plastics for automotive, appliance, packaging and agri brands.

Material
PA66 GF30
HDT
250 °C
Tensile
180 MPa
Cavities
4
materials:
  • PP
  • HDPE
  • ABS
  • PC
  • PC/ABS
  • PA6
  • PA66 GF30
  • POM
  • PBT
  • PMMA
  • TPE
  • FR-ABS
  • ASA
  • PPS
  • 42moulding machines (sample)
  • 30–650 tclamping force range
  • 120+moulds built a year
  • <150 ppmcustomer rejection rate

Parts we make

Built to drawing, in volume

All parts →
  • Appliances and electrical

    Appliance housings

    Mixer, fan and air purifier housings in high-gloss ABS and PP.

    Typical batch 10,000 pcsFirst parts 4 to 6 weeks with new mould

  • Industrial and agri

    Gears and bushes

    Glass-filled nylon and acetal gears and bushes for motors and machines.

    Typical batch 10,000 pcsFirst parts 4 to 6 weeks with new mould

  • Caps and packaging

    Caps and closures

    Flip-top and screw caps for personal care and food, in food-grade PP and HDPE.

    Typical batch 5,00,000 pcsFirst parts 4 to 6 weeks with new mould

How a new part starts

From CAD file to approved part

Inside the facility →
  1. 01

    DFM review

    Send STEP files. Draft, wall thickness and gate advice in 48 hours.

  2. 02

    Mould design

    Mould flow analysis and a 3D mould design for your approval.

  3. 03

    Tool room

    Mould steel cut on CNC and EDM in our own tool room.

  4. 04

    Trials (T1)

    First samples with an inspection report in 4 to 6 weeks.

  5. 05

    Production

    Serial supply with PPAP, SPC and batch traceability.

Certified for automotive and medical

Quality system →
  • IATF 16949:2016
  • ISO 9001:2015
  • ISO 13485
  • ISO 14001:2015

What engineers say

  • Their DFM report cut our housing's cycle time by 9 seconds before the mould was even cut. That's real money at 3 lakh parts a year.

    Purchase head, appliance brand, Pune (sample)

  • PPAP level 3 submitted on time, zero rejections across 18 months of clip supply.

    Supplier quality engineer, Tier-1 auto supplier (sample)

  • We had a mould but no moulder. Polymax took the tool, ran trials in a week and started supply in three.

    Founder, irrigation products company, Nashik (sample)

Have a CAD file? Get a DFM review.

Start a part enquiry online, then send your STEP file. Engineering feedback in 48 hours.

WhatsApp us