Appliances and electrical
Appliance housings
Mixer, fan and air purifier housings in high-gloss ABS and PP.
Typical batch 10,000 pcsFirst parts 4 to 6 weeks with new mould
// custom injection moulding · 30 to 650 t · since 2006 (sample)
We design moulds, cut them in our own tool room and mould parts in 14 engineering plastics for automotive, appliance, packaging and agri brands.
Parts we make
Appliances and electrical
Mixer, fan and air purifier housings in high-gloss ABS and PP.
Typical batch 10,000 pcsFirst parts 4 to 6 weeks with new mould
Industrial and agri
Glass-filled nylon and acetal gears and bushes for motors and machines.
Typical batch 10,000 pcsFirst parts 4 to 6 weeks with new mould
Caps and packaging
Flip-top and screw caps for personal care and food, in food-grade PP and HDPE.
Typical batch 5,00,000 pcsFirst parts 4 to 6 weeks with new mould
How a new part starts
Send STEP files. Draft, wall thickness and gate advice in 48 hours.
Mould flow analysis and a 3D mould design for your approval.
Mould steel cut on CNC and EDM in our own tool room.
First samples with an inspection report in 4 to 6 weeks.
Serial supply with PPAP, SPC and batch traceability.
Their DFM report cut our housing's cycle time by 9 seconds before the mould was even cut. That's real money at 3 lakh parts a year.
Purchase head, appliance brand, Pune (sample)
PPAP level 3 submitted on time, zero rejections across 18 months of clip supply.
Supplier quality engineer, Tier-1 auto supplier (sample)
We had a mould but no moulder. Polymax took the tool, ran trials in a week and started supply in three.
Founder, irrigation products company, Nashik (sample)
Start a part enquiry online, then send your STEP file. Engineering feedback in 48 hours.